Jordan type approval
We review product approval requirements for Jordan against the device technologies, intended use and application route. Current requirements are confirmed before filing.
Request a quote for Jordan- Authority
- TRC
- Certificate validity
- Confirmed by conformity scheme and issue type
- Local representative
- Applicant eligibility confirmed for the route
- In-country testing
- Testing or samples may be required, depending on device and route
- Typical lead time
- Quoted after technical file review
How Joe Trades handles Jordan
Scoping. We identify the competent authority, applicable approval route and acceptable documents for the product and intended use.
Local applicant. Applicant eligibility confirmed for the route.
Testing. Testing or samples may be required, depending on device and route.
Validity and renewal. Confirmed by conformity scheme and issue type.
What we will ask you for
- Product description and photos
- Model list and differences between variants
- Wireless technologies, frequency bands and output power
- Test reports from your lab (radio, EMC, safety as applicable)
- User manual and label artwork
- Declaration of conformity and any existing approvals, such as CE RED or FCC
- Company details, and an authorisation letter if an applicant is required
This is an initial preparation list, not confirmed requirements for every product. We confirm the documents and competent authority during scoping.
Jordan at a glance
- Authority
- Telecommunications Regulatory Commission (TRC)
- Capital
- Amman
- Calling code
- +962
- Currency
- Jordanian Dinar (JOD)
- ISO code
- JO
- Region
- Middle East
Questions about Jordan
How long does product approval in Jordan take?
Quoted after technical file review. Timing depends on document readiness, testing and authority review. Approval dates are not guaranteed.
Do I need a local applicant in Jordan?
Applicant eligibility confirmed for the route.
Can existing test reports be used in Jordan?
We review report scope, applicable standards and laboratory recognition for the route. Testing or samples may be required, depending on device and route.
Other Middle East markets
Requirements and approval routes change over time. We confirm the current position with the authority before any filing, and we do not guarantee approval or approval dates.